Skip to contentComing soon: SprintProof for ChatGPT and Codex

Use case · Product managers

You get asked for the date. Give one you can stand behind.

Go from a rough idea to a plan your engineers reviewed, a range with the dates you can be 50, 80 and 90% sure of, and a deck for leadership.

A feature from idea to tasks in 43 seconds. The idea in your own words, the planner asking what done means, the drafted parts, the questions you might have missed, a range with 50, 80 and 90% dates, and the tasks. Example data; the captions are part of the picture.

In short

Product managers use SprintProof to plan a feature before the sprint starts. The AI interviews you about the idea, drafts the work, and checks it for the parts that usually get missed. Your engineers review and sign it off. You get a range with 50, 80 and 90% dates, a deck to present it, and tasks for the team.

What you get

What you take into the planning meeting.

  • A brief written before the sprint

    Who it is for, what done means for v1 and what is out of scope, captured in the interview.

  • Fewer surprises mid-sprint

    The gap review asks about the parts that usually turn up late, before anyone starts building.

  • A range, not one number

    Say “done by this date, with 80% confidence” and show how the total adds up.

  • Engineers on the record

    Comments, blind estimates and sign-off happen on the plan, so the estimate is the team’s, not yours alone.

  • A deck for leadership

    Summary, estimate range and dates, risks and the ask, in your company’s brand, for 15 cr.

  • Tasks ready to build

    Tasks with acceptance criteria (25 cr to draft) go to Jira or Linear, or out as CSV.

How it works

From an idea to a date, in five steps.

Every AI step shows its credit cost before you click, and nothing in the plan changes until someone accepts it.

  1. 01

    Describe the idea.

    Free

    Write a sentence or two. The AI interview asks who it is for, what done means for v1 and what is out of scope, one question at a time.

  2. 02

    Get a draft plan.

    40 cr

    The planner drafts the breakdown: parts across frontend, backend, data and cross-cutting work, each with best, likely and worst days.

  3. 03

    Find what was missing.

    20 cr

    The “Did you think of…?” review checks the plan against 153 checks, such as existing accounts, seat limits and bounced emails. You add what matters as parts.

  4. 04

    Have the team sign off.

    Engineers comment on parts, run blind estimates and approve or request changes. When everyone approves, the plan is Ready. None of this uses credits.

  5. 05

    Commit with a range.

    15 cr

    The estimate gives 50, 80 and 90% dates at no cost, and the planning deck presents them in your brand for 15 cr.

Why dates slip

A feature gets estimated as one number said in a meeting. The parts nobody thought about, such as what happens to existing accounts or what a seat limit does to invites, turn up mid-sprint. The date slips, and nobody can say why.

SprintProof moves that discovery before the sprint. The interview makes the scope explicit, the gap review asks the questions an experienced engineer would, and the estimate shows how uncertain the plan still is.

When leadership asks for a date

The estimate shows a range and the dates you hit with 50, 80 and 90% confidence, from 10,000 simulated runs over every part’s best, likely and worst days. It also shows how much came from planned work, how much from the review, overhead and margin, and which parts are riskiest.

Make a deck from the plan for a leadership audience (15 cr), practise with the speaker notes and questions, and present it full screen. Or send a view-only share link.

You stay in charge of the plan

The AI suggests and people accept: nothing in the plan changes without a click. Every assumption the planner made is listed for you to mark Right or Not quite.

FAQ

Product managers: common questions

Do I need my engineers to use SprintProof too?
You can draft a plan alone, but the estimate is better when engineers review it. They comment on parts, vote in blind estimates and sign off. Seats are per person on the Team plan.
Will SprintProof give me one delivery date?
No. It gives a range and the dates you hit with 50, 80 and 90% confidence, so you can say how sure the team is about each one.
Does it replace Jira or Linear?
No. SprintProof is for planning a feature before the sprint. Once the plan is signed off, its tasks go to Jira or Linear, or out as a CSV file, and the team builds from there.
How much does planning one feature cost?
Draft, gap review and tasks together are 85 credits, since the interview before the first draft is free. A deck adds 15. Credits come with the Team plan; see the pricing page.

Team

Plan the next feature before the sprint starts.

Create your account and name your workspace. Your first feature plan is free. To keep planning, subscribe to Team: the 14-day money-back guarantee applies.

Want to hear when the ChatGPT and Codex plugin ships? Leave your email.

Team size (optional)
One email when it ships. No spam.