Plan the feature before the sprint.Commit to dates you can defend.
SprintProof is an AI feature planning tool for product and engineering teams. It turns a feature idea into a reviewed plan, a range with 50, 80 and 90% dates, and tasks ready for Jira or Linear.
Every new workspace gets 100 AI credits once, no card needed: enough to draft one feature plan, run the gap review and draft its tasks. After that, Team is €10 per seat a month, incl. VAT.
Works with the tools your team already uses
- ChatGPTplugin · soon
- Codexplugin · soon
- Lineartasks
- Jiratasks
In short
SprintProof is an AI feature planning tool for product and engineering teams. Describe a feature and it drafts the parts, checks the plan against 153 expert checks, and gives your team a range with 50, 80 and 90% dates from 10,000 simulated runs, then tasks for Jira, Linear or CSV. Team is €10 per seat a month, incl. VAT.
See it work
One feature, from idea to tasks, in 43 seconds.
The interview, the drafted parts, the questions you might have missed, a range with dates, and the tasks. Example data; the captions are in the picture.

What the film shows
- 0:00Features get estimated as one number.
- 0:06Start with the idea, in your own words.
- 0:10The AI planner asks what done means first.
- 0:15It drafts the work, part by part.
- 0:20It asks what you missed. You decide.
- 0:26A range with 50, 80 and 90% dates.
- 0:32Tasks your team can pick up.
Rather click through it yourself?Open the example plan
Why SprintProof
“Two weeks?” is not a plan. A range with dates is.
Features get estimated as one number in a meeting, and the missing work shows up mid-sprint. SprintProof puts the parts, the risk and the open questions on the table before anyone commits.
The estimate
The usual wayOne number, no range, no date.
With SprintProofA range from 10,000 simulated runs, with the dates you can be 50, 80 and 90% sure of.
Missing work
The usual wayEdge cases turn up after the sprint starts.
With SprintProof“Did you think of…?” asks about them first, from 153 checks written by engineers.
Team input
The usual wayEveryone anchors on the first number said out loud.
With SprintProofEngineers estimate the risky parts blind. A wide spread starts the right conversation.
The AI
The usual wayA generated document nobody went through line by line.
With SprintProofThe AI suggests and people accept: nothing in the plan changes without a click.
Hand-off
The usual wayTasks retyped into the tracker, without the decisions behind them.
With SprintProofTasks with acceptance criteria go to Jira, Linear or CSV, with the answers from review.
Facts you can check
- 153checks in 12 areas, from permissions to rolloutHow the gap review works
- 10,000simulated runs behind every estimateHow estimates work
- 50 · 80 · 90%dates for every plan, never one numberTry the free estimator
- 0 creditsfor editing, comments, blind estimates, sign-off, presenting and exportsPricing and credits
How it works
From feature idea to tasks, in four steps.
Every AI step shows its credit cost before you click, and nothing in the plan changes until someone accepts it.
- 01
Describe it, get a draft
40 crThe AI planner asks what done means, then drafts the parts with a best, likely and worst case each.
- 02
Did you think of…?
20 crThe plan is checked against 153 checks written by engineers. Add a finding as a part, or mark it not needed.
- 03
Commit to a range
SprintProof runs the plan 10,000 times and gives you the dates you can be 50, 80 and 90% sure of.
- 04
Hand off the tasks
25 crEach part becomes tasks with acceptance criteria and dependencies, ready for Jira, Linear or CSV.
Did you think of…?
The questions a senior engineer would ask, before the sprint.
SprintProof checks every plan against 153 checks written by engineers who have built these features before. Each match says why it matters and what it usually costs.
Answer it and it becomes a part with its own estimate, or a decision your team can find later. Add your own checks, so last quarter’s incident becomes next quarter’s question.
Software estimation
Estimates with error bars.
A single number hides how unsure you are. Every part gets a best, likely and worst case, and SprintProof runs the whole plan 10,000 times.
Pick how sure you need to be: 50% for planning, 80% for a commitment, 90% for a launch date. You also see which parts carry the risk.
Team review
Poke holes in the plan together.
Engineers estimate the risky parts blind, so nobody anchors on the loudest number. A wide spread means someone knows something. Talk before you commit.
Comments sit on every part, every change keeps who made it and why, and product, design and the tech lead sign off before the sprint starts.
Tasks
Tasks your team can pick up on Monday.
Each part becomes tasks with acceptance criteria, owners, estimates and dependencies. The AI drafts them; you edit them before anything is sent.
Send them to Jira or Linear, or download a CSV. The questions answered in review come along, so nobody rediscovers them mid-sprint.
Free sprint planning tools
Free tools for your next sprint planning meeting.
No sign-up. Use them with any tracker, and bring the results into SprintProof when you want the whole plan.
- Free toolThree-point estimatorBest, likely and worst case per part. Get the dates you can be 50, 80 and 90% sure of.Open
- Free toolPlanning pokerStart a room, share the link, vote with hidden cards. No sign-up.Open
- Guide + calculatorStory points to daysWhat a point means, how Jira uses them, and how to turn points into person-days.Open
- TemplateSprint planning templateGoal, capacity, a backlog with ranges and the risks. Google Sheets, Excel or Notion.Open
Also free: why features grow after the sprint starts, and the questions that catch it.
Pricing
One plan. AI credits included.
Team is €10 per seat a month, incl. VAT, or €8 per seat a month, billed yearly as €96 per seat, incl. VAT, and every seat adds 250 AI credits a month to a pool the whole team shares. Editing, comments, blind estimates, sign-off, presenting and exports never cost credits.
Team
or €8 per seat a month, incl. VAT, billed yearly (20% less)
Billed yearly as €96 per seat, incl. VAT. You save 20%.
For one product team planning every sprint.
About two to three full plans per person a month.
- From 1 seat: one seat for each person on the team
- Sign in with an email link or a passkey
- AI planner: interviews, breakdowns, gap reviews
- Split a part · 5 credits
- Full check library, plus your own checks
- Comments, blind estimates and sign-off
- Send tasks to Jira or Linear
- Your brand on slides and exports
14-day money-back guarantee: ask support within 14 days of a payment and it is refunded in full.
A larger company, or need something Team doesn’t cover? Talk to us.
Hosted in the EU. Payments are handled by Stripe. Read the privacy policy.
Your first feature plan is free. The free tools and the example plan need no account. Team comes with a 14-day money-back guarantee.
Pricing and creditsChatGPT and Codex · coming soon
Plan in ChatGPT. Build in Codex.
Coming soon: the SprintProof plugin will bring the same workspace and the same credits into ChatGPT and Codex. Plan a feature in a chat and get the parts, the range and the date back.
In Codex you will be able to pick up a task with its acceptance criteria. The time it really took will go back to the plan, so the next estimate learns from this one.
FAQ
Questions, answered.
What is SprintProof?
How do I start?
Does the AI change my plan on its own?
Is there a free plan?
Can I get a refund?
What does it cost?
What do credits pay for?
Which trackers does it work with?
Can I use it inside ChatGPT or Codex?
Start planning
Your next feature deserves more than a guess.
Create your account and name your workspace. Your first feature plan is free. To keep planning, subscribe to Team: the 14-day money-back guarantee applies.
Want to hear when the ChatGPT and Codex plugin ships? Leave your email.